Requestor Information





If your request is not for Regulated Collocation, please discontinue this form and refer to the Edge Colocation Location Assessment Process available from the Assessment and Ordering page in the Edge Colocation menu above.
Wholesale Customer Information





Customer Primary Collocation Contact






Customer Primary Billing Contact










Desired Collocation Information








(See Requirements Below)

Requirements



- Traditional Physical (InterState - FCC) - Minimum 100 Sq. Ft.
- Traditional Physical (IntraState) - Minimum 25 Sq. Ft.
- Virtual (InterState - FCC) - Number of 1/4 Relay Racks/Bays
- Virtual (IntraState) - Number of 1/4 Relay Racks/Bays
- Virtual (ICA) - Number of 1/4 Relay Racks/Bays
- SCOPE - Number of Relay Racks/Bays
- CCOE - Number of Relay Racks/Bays
- Cageless - Number of Relay Racks/Bays
- Caged - Minimum 25 Sq. Ft.





Space Requirements
*Reminder CLEC is responsible for acquiring and placing their own rack in their regulated collocation space (except when virtual is being requested).



Shared/Subleased Space Details
For this type of arrangement, you must provide the name(s) of the Guest CLEC(s) and the amount of space that is to be allocated to each Guest CLEC.




Detailed Power Requirements
Provide the total number of “A” feeds and/or the total number of “B” feeds for each type of collocation request. Indicate the requested drain/load per feed and the fuse size per feed.  

Fused capacity shall not exceed 2.5 times the CLEC specified load per feed.  (Frontier bills for DC power in accordance with the applicable tariff provision.)  Drain/load per feed must be expressed in whole numbers and not fractions.  

When ordering multiple power feeds, please indicate each feed’s requirement separately.  (Example:  Feed Requirement 1:2 – “A” feeds, each with 20 amps drain/load per feed and each feed fused at 30 amps; and 2 “B” feeds, each with 20 amps drain/load per feed and each feed fused at 30 amps.  Feed Requirement 2:  1 “A” feed, with 10 amps drain/load and fused at 15 amps; and 1 “B” feed, with 10 amps drain/load and fused at 15 amps.)  

Fusing at 2.5 times load may not be possible in all cases based on the CLEC specified load.  In those situations, the CLEC must determine whether to choose a fuse size that is less than 2.5 times load or increase its load in order to conform to the industry fuse sizes.

Joint coordination may be required to identify applicable power feeds. Frontier must approve all drain/load or fusing changes to existing power cables. Please note all applicable tariff/interconnection agreement rates and augment intervals will apply for an increase in fuse or drain size that requires new cabling.

AC Power




Number of Dedicated 20 AMP Circuits to be Provided for Requestor’s Equipment 
DC Power Configuration







Equipment Specifications






Fully Loaded

Ultimate Heat Release

In AMPS for 48 Volt DC






NEBS Conformance





Entrance Facility Information


Lease Fiber from Competitive Access Transport Terminal (CATT) Provider Details


CATT Provider LOA is required for this request!
Cable Details
Feeder Cable



(12, 24)
Riser Cable



(12, 24)
Cable Characteristics




Cable Information

Provide detailed information on the desired direction from where the cable originates or desired Manhole “0” locations (s):







Engineering Vendor



Outside Plant (Cable Placement) Vendor



Outside Plant (Cable Splicing) Vendor



Equipment Installation Vendor



Riser Cable Installation Vendor



Cage Construction Vendor



Terminations (CFA)







*All intraoffice cabling will be provide by Frontier.  All CFA termination cabling will be capped and coiled in the regulated collocation space for CLEC termination.








List of Plug-In Cards





Plug-In Cards Section



Plug-In Cards



Certificate of Insurance
A Certificate of Insurance must be provided for all new sites prior to occupancy.




A Certificate of Insurance.


Optional to upload a diagram, LOA or any additional documentation that pertains to this request